2017 Site Visit To 33KV Substation & Main Switch Board (MSB)

Students for subject EEE3306 Electrical Wiring Design had visited to the 33kv Substation at UPM and Main Switch Board (MSB) at Faculty of Engineering on 1 November 2017. The visit was participated by 15 students and one lecturer and there were four staffs from Development Office and Asset Management to guide the students during the visit.

The visit was organised so that students can gain knowledge and idea through the activities at the substation. Furthermore, students can get experience and see on how the substation works in real life. In addition, the visit also establish friendship among the students and the lecturer and help them improve their communication skill.

The students assembled at Faculty of Engineering at 9.45 am. Then, they depart from the faculty at 10.00 am and arrived at the substation around 10.15 am. The visit at the substation took around one hour. After that, they moved to the MSB at Faculty of Engineering. At this site, the visit took around half an hour because it is small compare to the substation. The visit was ended around 12.30 pm.

All the students of EEE3306 Electrical Wiring Design would like to thank all the staffs of Development Office and Asset Management for helping to make this visit successful. Also, thank you to all the students for participating this visit.

Posted in 2017.